Quote:
Originally Posted by KarenRei
Thanks. And pack capacity (kWh) and min/max charge within the DOD?
|
I'm a newbie also so I have no min/max info other than what others here have posted. The pack capacity is about 1 kW-h, about the same as other hybrids. If 80/20 is accurate, that leaves about 0.6 kW-h useable.